3D Modelling, Design and Safety Management in High Rise Building using Bim
Mohammed Waheed1, Mahmad Naheed2, Parvez Patel3, Syed Mubashir Hussain4, A.B Harwalkar5
1Mohammed Waheed*, B.E student, Department of Civil Engineering PDA College of Engineering kalaburagi-585102, Karnataka, India.
2Mahmad Naheed, B.E student, Department of Civil Engineering PDA College of Engineering kalaburagi-585102, Karnataka, India.
3Parvez Patel, B. E student, Department of Civil Engineering PDA College of Engineering kalaburagi-585102, Karnataka, India.
4Syed Mubashir Hussain, B. E student, Department of Civil Engineering PDA College of Engineering kalaburagi-585102, Karnataka, India.
5Dr Aravindkumar B Harwalkar, Associate Professor Department of Civil Engineering PDA College of Engineering kalaburagi-585102, Karnataka, India.
Manuscript received on September 08, 2021. | Revised Manuscript received on September 15, 2021. | Manuscript published on October 30, 2021.. | PP: 41-50 | Volume-11 Issue-1, October 2021. | Retrieval Number: 100.1/ijeat.A31311011121 | DOI: 10.35940/ijeat.A3131.1011121
Open Access | Ethics and  Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: In this works 3D modeling, design and safety management of high rise building using building information modeling (BIM) technology is carried out.. Initially a AutoCAD plan with all its salient features is developed following byelaws of high rise building. Then the 3D modeling and rendering of high rise building is done in the Revit architecture of the 2D plan which is imported from the AutoCAD. The analysis and design of high rise building is carried out using ETabs software. Apart from the structural design Mechanical, Electrical and Plumbing (MEP) services design is carried out using BIM technology . The layout of fire safety system is specified efficiently with use of BIM in co-ordination with MEP services. The application of BIM based design process resulted in considerable time reduction in compression with traditional design process and the holistic design of the high rise building is carried out with the compatibility of different softwares.
Keywords: High Rise Building; Bim; Mep; Fire Safety.
Scope of the Article: Building and Environmental Acoustics