Loading

Development of an ANN Model to Simulate the Auxiliary Power Generation from an Irrigation Barrage
Koshy P.S.1, Prince Arulraj G.2, Brema J.3

1Koshy P.S.,* Research Scholar, Karunya Institute of Technology and Sciences, (Tamil Nadu), India.
2Prince Arulraj G., Professor and Dean, Karunya Institute of Technology and Sciences, (Tamil Nadu), India.
3Brema J., Professor, Civil Engineering Department, Karunya Institute of Technology and Sciences, (Tamil Nadu), India.
Manuscript received on September 26, 2019. | Revised Manuscript received on October 15, 2019. | Manuscript published on October 30, 2019. | PP: 1033-1039 | Volume-9 Issue-1, October 2019 | Retrieval Number: A9469109119/2019©BEIESP | DOI: 10.35940/ijeat.A9469.109119
Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: The aim of this paper is to correlate the auxiliary power generation from an irrigation reservoir with the power generation of its upstream hydro power project in a cascade reservoir system. System considered for the study is the Pamba Basin- Kakkad Hydro Power Project and Maniyar Reservoir of Pamba Irrigation Project of Kerala State. In a water year from the 1 st June to 31st May, irrigation period spans for seven months from November to May in the Irrigation Project. As the water release of the upstream Hydro Electric Plant exceeds the irrigation demand, even during the peak irrigating months of January and February, there is surplus inflow for power generation. A water year is divided to two seasons namely, Irrigation and Non-Irrigation. An Artificial Neural Network (ANN) based model is developed to optimize the power generation using the surplus water and the outputs are compared with the real time data. In the ANN model, the inputs considered are the Generation in units of the upstream Kakkad Hydro Electric Project (Kakkad-HEP), the Rainfall in the catchment and the Irrigation Supply. Spillage from the barrage and the Power Generation in the adjoining Carborandum Universal Madras India Ltd. company’s Small Hydro Electric Project (CUMI-SHEP) is considered as the output. The results obtained shows that the power generation from the ANN model closely matches with the real time data. Analysis is done with the aid of MATLAB ANN tool box.
Keywords: Artificial Neural Networks (ANN), Small Hydro Electric Project (SHEP), Reservoir Operation, Feed Forward Back Propagation, MATLAB.